Waste Water Treatment Facilities Project for the Village of Fowlerville

The 2006 wastewater treatment plant expansion and improvements project upgraded the stabilization lagoon facility to a mechanical oxidation ditch facility. This is a variation of the activated sludge process with a continuous flow closed loop biological reactor configuration.

Read more details about the Village of Fowlerville's Waste Water Treatment Process.


 
Year: Fall 2005

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Davis Construction sinks dewatering casing to lower the level of the groundwater so underground piping and structures can be installed.



 
Year: Fall 2005

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Dewatering casing installation.



 
Year: Fall 2005

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Sub-base preparation for the oxidation ditches.


 
Year: Fall 2005

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Forms are placed in the basic outline of the footing for the Oxidation Ditches.


 
Year: Fall 2005

Name: Waste Water Treatment Facility Project - Village of Fowlerville

This layer of concrete is called a Mud Mat, which allows the steel to be tied and erected without becoming covered with mud and dirt.



 
Year: Fall 2005

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Construction of the steel mat which will reinforce the floor and footing of the two new Oxidation Ditches.



 
Year: Fall 2005

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Here is a bird’s eye view of the progress of the plant. The center footing for the Easterly Clarifier is in place, steel is being erected for the floor/footing of the Oxidation Ditches, and the Splitter Box between the two Clarifiers is being constructed.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Here we can see the mechanical contractor, Harper Industrial, is installing Ductile Iron piping connecting the Clarifier to the Splitter Box between the two Clarifiers.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Concrete for the floor/footing of the Oxidation Ditches is being poured. This pour lasted approximately 14 hours and used over 600 cubic yards of concrete.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

The earterly oxidation ditch floor being finished with a power trowel.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

A power screed is being used in this photograph. This machine uses a laser level to smooth the concrete to a particular elevation and can be set to a specific slope to form the surface of the concrete to promote drainage.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

The Oxidation Ditch floors have been poured and are protected with insulation blankets. Clarifiers have had the Mud Mats poured and the first elevation pour of the Splitter Box is complete. Forms for the floor/footing of the Clarifiers are now in place and steel is being placed within the forms.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Here we can see the steel being finished in the Easterly Clarifier. PVC waterstop, which can be seen around the perimeter of the structure, provides a seal between two separate concrete pours.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

At this point in the project, cold weather has set in. Progress has slowed a bit, but steel is still being tied and erected in the Oxidation Ditches, as shown here, as well as in the Clarifiers (shown on the next photograph).



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Davis Construction is placing concrete for the floor/footing of the new Clarifiers.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

This picture shows the concrete pour for the new Clarifiers complete and the crew beginning to place insulation blankets over the fresh pour to protect the concrete from becoming damaged by the cold.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

In this photograph we can see the overall progress of the project. Clarifiers have floors poured and are protected with insulation blankets. Oxidation Ditches are having steel erected for the walls. The basin drain lines are being installed from the ditches to the Basin Manhole.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Here we can see the forms being erected for the Easternmost exterior wall for the Oxidation Ditches. The floor where the forms rest has been cleaned and is free of ice and debris.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Here we can see the same section of exterior wall as shown in the previous photograph. In this frame we can see the concrete being placed by means of concrete bucket and a chute with an elephant trunk attached. The forms are covered with insulation blankets to protect the fresh concrete from the cold.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

The RAS/WAS piping that exits the Wetwell to the East of the Structure and enters the Headworks Building.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

Crew members tying steel after the interior radial forms are set in place. The crew member under the scaffold is cleaning the floor so it is free of ice and debris so the wall will seal to the floor.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

The easterly Oxidation Ditch has the walls in the Northeast quadrant completed.



 
Year: Winter 2006

Name: Waste Water Treatment Facility Project - Village of Fowlerville

The easterly Oxidation ditch has the northerly half completed and the westerly ditch has the northerly radial wall complete.



 